Brownsburg Water Meter Replacement Project

NECO is pleased to have been selected as the installation contractor for the Cleves Water Meter Replacement Project.

During the installation, you will receive a new water meter with an attached radio transmitter unit that will send readings directly to the Water Billing office. This project will result in an improved level of customer service through more accurate and consistent billing.

Installation should take between 30-60 minutes.  The existing meter will be photographed, removed and replaced with a new model.  Look for our vehicles with the NECO Field Division logo.

A selection of Frequently Asked Questions can be viewed through the link below.